Why ?

The Qi Edge

service image 1
Low Life Cycle Cost

We design buildings that are sustainable economically as well, and hence have low maintenance cost though out its life cycle.

service image 2
Healthier Buildings

We ensure our buildings to be healthy keeping in mind occupant comfort and well-being, after all we are spending ninety percent of our times indoor.

service image 3
Energy Efficient Design

We strive to bring energy efficiency in our design through passive and active strategies. This leads to reducing your energy bills.

service image 5
Construction Warranty

We provide our services even post construction. Yes, you can consult us anytime in the warranty time period. We give you our word!

Choose Our Services

pricing-background

Get Quote!



Don't know Built up Area?

The Qi Advantage

# Qi Facets Qi Experience Typical Experience
1 Price
  • Fixed Price
  • No Hidden Cost
  • Everything on Paper
  • 40% increase in quote and final cost.
  • Hidden Charges, ofcourse.
2 Quality
  • Branded Materials
  • 98 Quality checks
  • Experts in AEC Industry
  • Site supervision
  • Quality control engineers
  • Low quality material to cut cost.
  • No quality checks.
  • Contractor is site supervisor
3 Design
  • Customized design with 3D
  • Energy efficient design
  • Experts with vast Experience
  • Vastu (on request)
  • Generalized design for everyone.
4 Life Cycle Cost
  • 25% less electricity consumption.
  • 20% less water consumption.
  • 18% less maintenance cost.
  • What is Life cycle costing?
5 Timeline
  • Fixed timeline
  • Penalty on us for delay
  • Communication plan
  • Unreliable timeline
6 Warranty
  • 4.5 Richter Scale earthquake warranty for Structure.
  • 5 year warranty on seepage/dampness.
  • 25 year warranty on structural members.
  • No warranty
7 Social Welfare
  • 50% women workforce on site.
  • Strict policy against child labour
  • Clean Drinking water
  • First Aid
  • Security measures
  • Toilet for workers
  • Accommodation for labours
  • Creche facility for Labour children
  • Poor working standards.
8 Material
  • Durable Material
  • Low Embodied energy
  • Low VOC paints
  • Use of regular material available in market.
9 Post Construction Support
  • Maintenance team available
  • No post construction service
10 Site Management
  • Project Management team
  • Quality Control experts
  • Site managed by Contractor